Docs
$RETURNOpen app
Get startedBorrowLendSafetyDevelopers
Safety
Safety
Safety overview

The contract

CustodyWhat we controlIncident extensionsAudits

Token risks

Issuer controlsSplits, dividends and rewards

Using it safely

Risks by roleSafety checklist

Incident extensions

Open in Claude

The emergency delay of repayment deadlines. When it applies, its hard limits, and why you should not plan around it.

If a serious incident stops people from repaying (a chain outage, or a token frozen or paused), we can extend the repayment deadline.

The rules

RuleDetail
ScopeOne token (affecting loans that use it as collateral or loan token), or all loans. It covers only loans opened before it was declared: a loan opened while an extension runs keeps the deadline it was signed with.
Per-loan capAt most 7 days beyond the loan's normal deadline, however many extensions are declared. The latest possible deadline is the due date plus 8 days.
Each declarationMust be later than the current window, and at most 7 days into the future.
CostNone. The payback does not change and no interest is added.
DirectionExtend only. We cannot shorten a deadline or undo a claim that has already happened.

Limits of the safety valve

  • We must declare it. We might not, and an outage could also stop us from declaring it.
  • It only delays the claim. It does not change who gets what.
  • It can reopen a missed deadline. Declared after a loan's deadline but before anyone claims the collateral, it lets the borrower pay back again, within the 7-day cap. Note holders who want the collateral should claim promptly.
  • Saved reminders do not update. A calendar file or saved terms keep the original deadline. The loan page recomputes the current deadline from the contract's extension events, and checks it against the contract before offering an action.

Treat the normal deadline, due date plus one day, as the real one. The extension reduces risk; it does not guarantee time to repay.

Last updated 22 October 2026

What we control

Every power we keep over the Return contract, and the things we cannot do.

Audits

The independent audit of the Return contract.

On this page

The rulesLimits of the safety valve